Skip to content
Solutions by Industry

Five operating contexts, one autonomous vision stack.

From Tier-1 automotive body-in-white cells to AS9100-grade aerospace parts rooms, Strambotix ships the same vision stack tuned to your line's throughput, certification, and brownfield constraints. Pick the profile that matches your shop floor — we'll bring the cell, the compute, and a solutions engineer on-site.

  • 1,840+ active production sites
  • 11 days mean deployment-to-first-part
  • 11 countries shipping today
Five industry profiles · one platform

Pick the cell that matches your line.

Every Strambotix deployment runs the same vision stack — the Photon-3 compute, the Zero-Shot Part Recognition engine, and the safety-rated motion envelope — re-tuned per vertical against audited throughput, accuracy, and certification targets. No re-platforming. No integrators writing glue code.

Tier-1 Automotive

Body-in-white and EV battery cells.

High-mix BIW spot welds, battery tray kitting, and underbody inspection — running beside human operators in mixed zones, no fenced cage. Zero-Shot Part Recognition swaps SKUs in seconds; the Photon-3 keeps weld-tip vision under 8 ms so cycle time doesn't slip.

Cell footprint
2.4 × 3.1 m
Cycle time
6.2 s avg
Live at
Toyota Material Handling
Book a Walkthrough →
Aerospace & Defense

AS9100D-certified part handling.

Composite layup prep, fastener kitting, and FOD-mitigating pick cells for aerospace primes. Strambotix is the only US-based robotics vendor with dual ISO 13849 and AS9100D certifications on a single platform — your quality team gets one audit trail, not three.

Book a Walkthrough →
Logistics & 3PL

Picking, induction, and palletizing.

Tote induction and mixed-SKU palletizing for high-volume fulfillment. Vision-guided depallet from random arrival, with 93.4% first-pass pick accuracy across audited production cells. Drops into existing WMS/WCS without a 12-month middleware rebuild.

Book a Walkthrough →
Electronics & SMT

High-mix, low-volume assembly.

Connector placement, micro-component inspection, and tape-and-reel feeding for contract manufacturers running 200+ SKUs per shift. Zero-Shot Part Recognition trains on a new SKU from just 14 reference images — changeover measured in minutes, not days.

Book a Walkthrough →

Have a brownfield line that doesn't fit a clean vertical? Most of our wins come from cells that started as "impossible" retrofit scope. The on-site discovery walks your floor before a contract is ever drafted.

Book a Discovery Walkthrough
Audited metrics · FY2022 — FY2024

Same platform, measured on 1,840+ production sites.

71% integration-time reduction vs. traditional integrator timelines · 340+ deployments 2021–2025
93.4% mean first-pass pick accuracy customer cells audited by A3
<8 ms edge inference latency Photon-3 onboard compute unit
11 days deployment to first-part mean across the last 200 deployments
  • ISO 13849 · Safety
  • AS9100D · Aerospace
  • G2 High Performer · Q1–Q4 2024
  • Fast Company · Next Big Things in Tech 2024
  • Automation World · 2024 Cover Story
  • MSSC-Certified Operator Curriculum

Operating context, not slideware

Cells already running on the Strambotix stack

Twelve verticals. One camera, one Photon-3 compute unit, one vision stack retraining on a new SKU from 14 reference images. Below: the four contexts where we have the deepest install base right now.

  • Automotive Tier-1 /A-01

    Body-in-white weld cell guidance

    6DOF seam tracking on stamped panels with mixed SKUs. Zero-shot recognition on a new model variant inside a single shift. Currently deployed across body-in-white cells in three North American OEM plants.

    Pick accuracy
    93.4%
    Avg. deployment-to-first-part
    11 days
    Read the cell spec →
  • Aerospace & Defense /A-02

    AS9100-grade visual inspection

    Surface defect classification on machined turbine components and composite layups, running on the only US robotics platform holding both ISO 13849 and AS9100D on a single stack.

    Edge inference latency
    < 8 ms
    Vision integration time
    −71% vs. traditional
    Read the cell spec →
  • Logistics & DC /A-03

    Mixed-SKU depalletizing & induction

    Trailer- and floor-loaded case induction into sortation. The Zero-Shot Part Recognition engine picks up a new carton profile from 14 reference images, no integrator onsite.

    New SKU training time
    14 images
    Active production sites
    1,840+
    Read the cell spec →
  • Electronics & SMT /A-04

    Feeder changeover & PCBA handoff

    Sub-millimeter fiducial alignment on high-mix SMT lines. Photon-3 handles lighting variance from shop-floor fluorescents without re-tuning, so changeovers stay under one shift.

    Vision-system integration cut
    71%
    Operator training
    MSSC-certified
    Read the cell spec →

// platform thesis

Five industries. One stack. Zero shared codebase between cells.

Most robotics vendors ship you a vertical and bolt a vision stack onto it last quarter. We did it the other way around: one camera, one Photon-3 onboard compute unit, one vision stack with a patented Zero-Shot Part Recognition engine that retrains on a new SKU from 14 reference images. That same stack walks into a Tier-1 weld cell in one plant and a depalletize cell in a distribution center the next morning — no integrator bench time, no separate ML pipeline, no second vendor on the phone when something shifts on the line.

The headline is under 72 hours from dock to first good part, but the real unlock is what happens after. A new part number lands, a plant manager photographs it fourteen times at the line, and the cell is picking by lunch. That is the connective tissue across every vertical below — not a feature checklist, an operating model.

— Strambotix engineering, Boulder CO

// next step

Book a Discovery Walkthrough — leave with a deployable cell sketch, not a slide deck.

Forty-five minutes with a Strambotix solutions engineer and one of our field application engineers. Bring a line drawing, a part print, or a photo of the cell you are evaluating. You leave the call with a Photon-3 spec, a 72-hour deployment plan, and a candid answer on whether this is the right cell for us. No deck, no NDA, no follow-up sales sequence.

  • Tell us the cell, the SKU mix, and the existing line constraints.
  • Engineer walks you through the Photon-3 compute unit and Zero-Shot Part Recognition on your part.
  • You walk away with a written deployment-to-first-part estimate and a price band.