New automation cells. Live in under 72 hours. No fenced cages. No PhD in-house.
Strambotix ships autonomous robotics and machine-vision stacks that drop into your existing line in a single long weekend — replacing 18-month integrator cycles with an 11-day average deployment-to-first-part.
Four modules you can drop into an existing line.
No monolithic suite, no 18-month SOW. Each Strambotix module ships hardened, certified, and field-serviceable by your current controls team.
-
01
Zero-Shot Part Recognition
Train on a new SKU from just 14 reference images. Patented engine runs new SKUs the same shift the print hits the floor — no labeled dataset project, no ML ops headcount.
-
02
Photon-3 Edge Compute
Onboard inference under 8 ms latency. Vision decisions happen at the cell, not in a cloud round-trip — keeping cycle times tight and OT networks clean.
-
03
Safety-Certified Platform
The only US-based robotics vendor with dual ISO 13849 (safety) and AS9100D (aerospace quality) certifications on a single platform. No fenced cages required for collaborative cells.
-
04
Brownfield Retrofit Kit
Mechanical, power, and EtherNet/IP adapters for the controllers already on your floor. Install during a planned weekend, return to production Monday morning.
9 of the Fortune 500 industrials run Strambotix in production.
Live deployments
- John Deere
- GE Aerospace
- Toyota Material Handling
- + 6 more Fortune 500 industrials
Screened-for credentials
- High PerformerIndustrial Automation, 4 consecutive quarters
- ISO 13849Functional safety certified
- AS9100DAerospace quality on a single platform
- MSSC-certifiedOperator training curriculum
Proof, not pitch
The four numbers that close the evaluation on the second pass.
Every metric below is measured across recent production deployments — not modeled, not projected, not cherry-picked from a single pilot cell.
-
71%
Vision-system integration time cut vs. traditional integrator timelines
-
11d
Average deployment-to-first-part time
-
93.4%
Mean first-pass pick accuracy in audited production cells
-
1,840+
Active production sites running the Strambotix stack
Sub-8 ms edge inference on the Photon-3 onboard compute unit. Series B closed March 2024 at $58M, led by Founders Fund.
Read the customer audit summariesFrom the floor
An automation director on the 72-hour promise in a brownfield cell.
We slotted a Strambotix cell into a 1998-era packaging line over a long weekend. Monday morning we were running production parts. The line lead in cell 4 had the system picking mixed SKUs before the integrator's project manager had finished his site-survey deck. Eleven days from crate to first acceptable part, and the union steward was the one asking when cell 5 was getting one.
Discovery Walkthrough
Put 30 minutes on the calendar to scope one cell.
A solutions engineer walks your line layout, current cycle time, and SKU mix — then tells you on the call whether a Strambotix drop-in is realistic inside a 72-hour window. No slideware, no NDA wall.
Solutions engineer · 30 min · calendar link after a 5-question scope form.
Not ready for a full walkthrough?
Talk to a Field Application EngineerLighter first touch · reference deployments in your sector · no scope form required.
- ISO 13849 & AS9100D dual-certified
- G2 High Performer · 4 consecutive quarters
- Currently shipping in 11 countries
- 186 engineers & field AEs on staff